| Scope of Work: |
Almaty Coca-Cola Factory’s -2x1600kVA Transformer Substation -2000kW Diesel Generators -Lighting and Power Installation -Fire Detection and Alarm System -Telephone and Data Distribution System -Grounding and Lightning Protection Systems -High pressure steam system -Pressurized air system -Raw water system -CO2 system -Ventilation system -Cold room installation -Heating system -Process piping -Waste water system -Boiler room installation -Air curtains -Split type A/C units -Drainage system -Fire protection system construction |